This includes the following hardware:
Physical Hardware:
citrix-fs-1
EMC CX200 SAN
2x BIG IP servers
CVSQL1 and CVSQL2
2xBrocade Fiber Switches
2x3Com 100Mbit Switches.
On the Virtual Cluster:
6 Citrix Servers: cvusd-citrix1-6
2 Web interface servers: cvusd-wi1 - cvusd-wi2
In the next day or two, I will be working on disconnecting all this hardware and cleaning up the rack space in the server room.
The only service that I had thought of which was still needed after the power down was the Certificate Authority, which was moved to do-fs1.
- This change was made on 10/21/2010 @ 12:45pm
No comments:
Post a Comment
Please make your comment. (GMK)
Note: Only a member of this blog may post a comment.